Free Bathroom Remodel Estimate Template & Generator

Most of what a bathroom estimate prices gets buried. This one takes a 42 square foot hall bath from an alcove tub to a tiled shower and puts the hidden work on its own lines: the sloped bed and bonded membrane, the flood test before any tile is set, 129 square feet of tile split into labor and an owner-selected allowance, the fan duct, and unit rates for the subfloor rot the walkthrough already suspects.

Create this estimate No signup to start · live preview · PDF download

PDF downloads cost $4.99 per document, or are included with Unlimited at $9/month.

Create & preview free. Watermark-free PDF: $4.99 USD. No subscription required.

Use-case checklist

What to include in a bathroom remodel estimate

Waterproofing is the line customers most want to cut and the one that cannot be redone later. If the membrane is thin at the curb or the pan never gets flood tested, nothing shows up for a year or two, and then it shows up as a stain on the ceiling below and a demolition bill for tile that was installed correctly on top of an assembly that was not. Nobody pays for that twice except you. Pricing the assembly as its own line, with the test written into it, makes it something the homeowner approves rather than something they never knew happened. Concealed damage is the second trap. A soft spot at the toilet flange almost never stops at the flange, so a subfloor rate per square foot and a plate rate per linear foot, agreed before demolition starts, keep day three from turning into a renegotiation.

  • room, existing condition, and proposed layout
  • demolition, waterproofing, tile, and labor
  • fixture, glass, vanity, and finish allowances
  • plumbing, electrical, ventilation, and permits
  • concealed damage, schedule, exclusions, and next step

Example starting lines

DescriptionQtyRate
Demolition and preparation allowance1$2,600
Tile and waterproofing allowance1$6,800
Fixtures and trade labor allowance1$7,900

Complete it cleanly

Record room dimensions and observed condition, identify the waterproofing and tile basis, separate fixture allowances, and state who handles permits, testing, patching, and concealed damage.

How to make a bathroom remodel estimate in 6 steps

  1. Open the estimate generator

    Start from this page so the estimate opens with fields and sample lines already set up for bathroom remodelers and residential contractors. No account is needed to create or preview.

  2. Enter both parties

    Add your business name, address and contact details, then the customer name and address exactly as they should appear on the record.

  3. Add the bathroom remodel lines

    Replace each sample line with the real work or goods. Make sure the document shows room, existing condition, and proposed layout, demolition, waterproofing, tile, and labor, fixture, glass, vanity, and finish allowances.

  4. Check the figures

    Totals calculate as you type. Confirm quantities, rates, any tax line and the final total against your own records before you send anything.

  5. Set the reference and dates

    Give the estimate a unique number and the correct date so it can be traced later and matched to related documents.

  6. Review and download the PDF

    Record room dimensions and observed condition, identify the waterproofing and tile basis, separate fixture allowances, and state who handles permits, testing, patching, and concealed damage. Preview is free; a PDF download costs $4.99, or is included with Unlimited.

Worked example

A 42 sq ft hall bath converted from alcove tub to tiled shower

Keystone Bath Works is pricing the hall bathroom at 26 Fenwick Avenue for the Adeyemi family, walked April 9, 2026. The room is 5 ft 4 in by 7 ft 10 in, the alcove tub and fiberglass surround come out for a tiled shower, and the floor already feels soft at the toilet flange.

Room and observed condition: 42 sq ft hall bath, alcove tub with fiberglass surround, soft floor noted at the toilet flange on Apr 9, 2026
42 sq ft
Demolition to studs and subfloor, tub and surround out, 1 dumpster pull
$2,350.00
Shower assembly: sloped mortar bed, bonded waterproof membrane over 88 sq ft of wall and the 14 sq ft pan, curb wrapped, linear drain set, 24-hour flood test before tile
$3,480.00
Tile labor and setting materials: 88 sq ft wall, 14 sq ft pan, 27 sq ft floor outside the shower, 129 sq ft at $17.50 per sq ft
$2,257.50
Tile allowance, owner selects: 129 sq ft plus 12% waste, rounded to 145 sq ft at $6.50 per sq ft supplied
$942.50
Fixture and finish allowances: shower valve and trim $520.00, toilet $410.00, 36 in vanity with top $1,180.00, mirror and lights $340.00, accessories $120.00
$2,570.00
Frameless glass panel and door, 3/8 in tempered, measured and ordered after tile is set
$1,850.00
Plumbing and electrical: valve rough, drain relocated 14 in, 20A GFCI-protected receptacle circuit, vanity lighting, exhaust fan on a 6 in insulated duct to the exterior soffit
$3,900.00
Concealed damage unit rates, billed only on written approval once the area is open: subfloor $22.00 per sq ft, stud sistering or bottom plate $145.00 per lf
not in total
Estimate total: permit fee billed at cost when issued, hallway paint and drywall outside the bath excluded
$17,350.00

Homeowners compare the $17,350 against a bid that never priced a bonded membrane or a flood test. Show the assembly as its own line, or you are the expensive one for doing the part that decides whether the shower lasts.

When this document is the right choice

Use this estimate to set a realistic expected cost before the final scope is known. An estimate is an informed approximation, not a final invoice. State the assumptions that could move the price and replace it with a quote or invoice once scope is confirmed.

Frequently asked questions

How should the flood test appear on the estimate, and when does it happen?

Give it a place in the sequence, not just a mention. The test happens after the pan and membrane are complete and before any tile goes down, and it holds the schedule for roughly a day. Put that hold on the estimate so the homeowner understands why nothing appears to be happening, and photograph the filled pan with the water line visible. That photograph is the only evidence the assembly was tested once tile covers it, and it is worth more than any sentence you write.

This is the only full bathroom in the house. What does the estimate have to say about that?

Put the days on the page, because the homeowner is pricing a hotel or a relative's spare room alongside your figure and will not raise it until demolition has already started. State the working days from demolition to a usable shower, and mark which of those days are holds rather than work, since a house with nobody in it looks like a crew that stopped caring. Then say what is available in between: whether the toilet gets reset temporarily at the end of a phase, whether the household is down to a half bath, and whether you are on site consecutive days or waiting on an inspector you do not schedule. Say what a concealed damage find does to the finish date too, because that is the one thing that moves it, and the homeowner should hear it here rather than on day three.

Why can the shower glass not be ordered at the same time as everything else?

Because it is measured off the finished tile, not off the drawing. Walls are never perfectly plumb, tile adds thickness that varies with the setting bed, and a frameless panel cut to a drawing dimension will not fit the opening you actually build. Write the glass as an allowance measured and ordered after tile is set, and put the fabrication lead time on the schedule, because the gap between a finished tile shower and a usable one is the part homeowners are least prepared for.

The homeowner asks for a niche and a bench after the estimate is accepted. Why are those not small additions?

Because each one is a hole you then have to make waterproof. A niche is framing, a sloped sill, a bonded return wrapped on every face, and cut tile on five surfaces. A bench is a structure standing inside the shower with the same membrane carried over it and a slope that has to shed water toward the drain. Neither is absorbed by a per square foot tile rate, and both are exactly where a shower leaks when they get added in a hurry. Price them as named lines with dimensions and a tile detail, and settle them before the walls close, because the framing has to be in before anything is waterproofed. If the homeowner wants to keep the option open, carry the framing now and the finish as an allowance, which costs far less than opening a finished wall.

What do I say about the exhaust fan and where it vents?

Price the duct run, not just the fan, and say where it terminates. Venting into an attic or a soffit cavity instead of to the outside is a moisture problem that surfaces later as stained sheathing, so state the termination point, the duct size, and whether the run is insulated, as the example does with a 6 inch insulated duct to the exterior soffit. Fan sizing and duct requirements are set by your local code, so confirm what applies with your building department before you commit to a number.